Note: This function is available on a tablet or PC.
This function moves test results and their test setups to another project.
- On the PROJECTS tab, make sure the project you want to receive the results has an ACTIVE status. If it does not, change the Status in the project's SETTINGS.
- On the PROJECTS tab, tap the project that has the results you want to move.
- Tap RESULTS.
- Tap the check box for each result you want to move. The MOVE TO... button shows above the list of results.
To move all the results on the page, tap the check box in the title bar for the results.
- Tap MOVE TO..., tap a project in the Move Selected Results to Another Project dialog, tap a subproject if necessary, then tap MOVE.
Comments
0 comments
Article is closed for comments.